Skip to content

Solution · Spot and fix

Every gap to the standard is reported, prioritized and fixed.

No more loose tags. A gap is reported in seconds from the phone or the screen, with its photo. It reaches the meeting, the team prioritizes it, gives it an owner and a date, and it stays visible until it’s closed.

DashboardsToday's entriesGapsActionsFloor walksMeetingsSettingsAssembly ⌄Report a gapCBEmergency stop out of reach at station 3In progressSafetyClose⋯Actions0 of 3 donePut the guard back on the kitting areamissing materialClara Boissieu ⌄—• BlockedMark off station 3Jonas Lemaître ⌄Nov 9• To doCheck the emergency stop on the kitting areaOcéane Fillon ⌄—• To doAdd an actionNobody yetmm/dd/yyyyAddComments1History2All3Status: Open → In progressby Camille Berger · Oct 19, 2026, 5:23 pmGap reported by Camille BergerOct 17, 2026, 2:34 pmDetailsOpenIn progressClosedCategorySafetyDue dateNov 2, 2026Originating teamAssemblyTransfer to another teamReported byCamille BergerCreated onOct 17, 2026, 2:34 pm
←Gaps · DaystreamReport a gapTitleOil leakCategoryDelaysPeopleQualitySafetyPhotos and filesTake a photoAdd a fileUp to 5 files, 15 MB each. Images, PDF and office documents.Description+ Due dateReport
A gap's record, and opening one with a photo from the phone
In 15 seconds

An action has a name and a date.

Actions · by personMonday 08:05Thursday 08:03CBClara BoissieuPut the kitting guard backGap #127Sort the batch from station 2Gap #130Put the kitting guard backGap #127 · due WednesdayLateMDMarc DelaunayGet a quote for a 200 L scrap binGap #73By FriClear the kitting walkwayGap #45By MonReplace the slicer sealGap #127 · created at the meetingBy ThursdayReplace the slicer sealGap #127 · created MondayTodayNLNadia LefèvrePost the routine at station 5Gap #129By TueCoach the new starterGap #133By Fri
  1. 01At Monday's meeting, an action is created during the discussion.
  2. 02It has a name and a date. Nobody copies it out.
  3. 03On Thursday, it rises to the top of Marc's column.
  4. 04When an action is late, it turns orange for the whole team to see.

Before, and with Daystream

Today

Loose tags that get lost, with no photo.

Hard to know what to handle first.

Decisions made in meetings get forgotten.

Support goes to whoever talks the loudest.

The same problem comes back without being linked to earlier ones.

With Daystream

Report from any screen, with photos and files; only the title is required.

SQCDP categories in color, due date, statuses Open, In progress, Closed: the team prioritizes in the meeting, in front of the same list.

Every decision becomes an action: what, who, by when. Blocking an action requires a reason.

Everyone works from the same gap list, with the same facts and the same photos.

The dated history of gaps makes it possible to spot recurrences.

Measured at an industrial pilot site

Time saved

10 to 15 minper day on gap handlingand better-prioritized gaps

Results observed at an industrial pilot site. They depend on each plant's organization.

What's included

Gaps

  • Report from any screen, mobile or computer; only the title is required.Available
  • Configurable SQCDP categories, description, photos and attachments.Available
  • Open, In progress and Closed statuses, with reopening possible.Available
  • Created from an off-target measurement or a floor walk answer.Available
  • Comments and dated history.Available
  • Hand-over to another team, escalation to the next level.Soon

Actions

  • Created in three fields (what, who, by when), linked to a gap or standalone.Available
  • Column view by person.Available
  • To do, Blocked, Done and Canceled statuses, with a mandatory reason to block or cancel.Available
  • Priority, photo, comments, history.Available
  • Ability to assign a person without an account.Available

Problem solving

  • Structured problem solving with classic Lean methods (5 whys, etc.).Soon
  • Assistant that spots recurrences and prepares the meeting.Soon
  • Import your own problem-solving template, filled in on the big screen like a whiteboard.Soon
  • Attached documents, photos and PDFs; export of the problem-solving documents.Soon

See Daystream on your standards, not on a generic demo.

Thirty minutes: one floor walk, one gap, one morning meeting on a big screen. Success criteria set together, review at six weeks.