Product OverviewField roundsGaps and actionsMeetings and visual managementIntegrations and APISecurity and IT
Who it’s for Plant managementContinuous improvementTeam leaders and operatorsMaintenance, quality, EHSIndustry 4.0 project lead
Get started PricingGetting started and pilotRequest a demo
Resources Templates to downloadFrequently asked questionsBlogLean Academy
FREN中文RO
Request a demo
Shop-floor management software for manufacturing

Bring shop-floor standards to life, together.

Field rounds, gaps and shift meetings in one place, so the shop floor gets a little better every day.

By the TEEPTRAK team: 700+ plants · 30+ countries Hosting in the EU, the US or China One price per plant, all-inclusive
ProductionMon, Oct 13 · morning shift · shift meeting
06:31Start the meeting
SSafety cross · October
12S345678910111213141516171819202122232425262728293031
142 days without lost-time accident
Accident-freeRind careUpcoming
POEE line 2TEEPTRAK
78%target 75%
QDowngraded wheels · 7 days
4todayat most 2
GGaps from previous shift · 3
#132 Scrapped grinding wheelsOpen
#128 Leak slicer 2In progress
#127 Guard station 4Closed
AActions
Replace the seal · Hugo T.Overdue
Recalibrate pH meter · Léa P.Today
Gap #133 reported by Karim B. Open
Hygiene check 4/6Mon, Oct 13 · morning shift
STEP 4

Cold room no. 2

between 2 and 6 °C
4,1 °C
YesNo
PreviousNext
The real problem

An issue gets lost when it changes hands. An action gets lost when nobody follows it up.

In most plants, information goes around a loop: paper, Excel, printing, posting on the board. At each step, something gets lost.

Entries
×2
Files
dozens
Traceability
none
Papernote it on the floorExcelre-enter it at the officePrintingprint before the meetingDisplaydisplay it, then wipe it− re-entry− 1 day overdue− unreadable at 35− wiped at the next shift
Nine situations you’ll recognize

Three moments in the day when the standard sticks slips.

1

On the floor

Rounds and audits
AuditWe print the checklist, fill it in, then re-enter it at the office.
With DaystreamThe round is done on the phone, once.
the solution →
ChecksPeriodic checks haven't been filled in for three months. Nobody noticed.
With DaystreamEvery completed round is dated and visible to the team.
the solution →
ActionsActions aren't linked to the anomalies found.
With DaystreamA “no” opens a gap and its action, directly.
the solution →
2

On gaps

Problem solving
TagsLoose tags that get lost, with no photo.
With DaystreamThe gap is logged on the spot, photo included.
the solution →
PrioritiesNo way to know what to deal with first.
With DaystreamThe team prioritizes in the meeting, in front of the same list.
the solution →
SupportSupport goes “to whoever shouts loudest”.
With DaystreamResources go where the facts call for them.
the solution →
3

In meeting

Shift meeting and performance
PreparationThe group leader comes in 30 minutes early to print.
With DaystreamThe team board is already on screen.
the solution →
ReadabilityDocuments a team of 30 to 35 people can't read.
With DaystreamA team screen readable from a distance, for everyone.
the solution →
NumbersTeams get different values for the same information.
With DaystreamOne source for the indicators, the same for everyone.
the solution →

And one more risk: an external audit can raise a nonconformity for lack of visual management. See the management view

The Daystream loop

What's seen on the shop floor reaches the meeting. What's decided is tracked through to closure.

One loop,not three tools.floor → meeting → closure 1Round2Gap3Meeting4Action5Check
1 · The shop floor

The round spots the gap.

The team leader does the round on their phone. A nonconforming answer becomes a gap, with its photo and its action.

  • Form on a phone, entered once
  • A numeric answer feeds the indicator
  • A “no” opens a gap and its action
2 · The problem

The gap has an owner and a date.

No more loose tags: the gap is logged on the spot, assigned, dated. It stays visible until it’s closed.

  • Title, photo, location: a few seconds
  • An owner, a due date
  • Actions tracked through to the end
3 · The team

The shift meeting prepares itself.

Indicators, open gaps and overdue actions appear on the team screen. Nobody comes in early to print.

  • S, Q, P, HR, C, E on one page
  • Multiple sources, including TEEPTRAK
  • Readable by the whole team, from a distance
4 · The decision

Every decision becomes an action.

What's decided in the meeting has a name and a date. Delays are visible to everyone, with no email reminders.

  • What, who, by when
  • Visible on the team screen
  • We track actions, not people
5 · The standard

The next round checks that it holds.

The action is done; the next round checks that the standard holds. The loop starts again, and the standard improves.

  • The shop floor confirms the fix
  • Indicators show the trend
  • The standard evolves with what we learn
Three building blocks, equal weight

One app, three everyday actions.

01 · FIELD ROUNDS

The check is done on the spot, once.

The team leader follows the form on their phone. Values feed the indicators; a “no” opens a gap and its action.

Today

Print, fill in, re-enter, update by hand.

With Daystream

One entry, on the floor. The team leader stays on the line.

Field rounds

Hygiene check 4/6Mon, Oct 13 · morning shift
STEP 4

Cold room no. 2

between 2 and 6 °C
4,1 °C
YesNo
GAP CREATED · QUALITYWet floor, cold room no. 2Action: clean and dry · Karim B. · before 10:00
PreviousNext
02 · GAPS AND ACTIONS

Every gap has an owner and a date.

Reported in seconds with a photo, handled in the shift meeting, visible until it’s resolved. Actions are assigned and tracked.

Today

Loose tags, no photo, no priority.

With Daystream

One single list, prioritized in front of the whole team.

Gaps and actions

Daystream
My dayDashboardsGapsActionsField roundsMeetings
Gap #128 · Manufacturing
Water leak under slicer 2
In progressSafetySlicing · Slicer 2Due Tue, Oct 14
Puddle of about 1 m² on the operator side. The water seems to come from the supply fitting. Area marked off for now.
Photo · 06:10Photo · 06:11
Actions · 3
Shut off the water supplyMarc D.Completed
Replace the fitting sealHugo T.In progress
Check for leaksKarim B.To do
Comments · 1
Marc D. · 06:40
Water supply shut off, floor cleaned. The slicer is running empty while we wait for the seal.
Details
Reported byKarim B.
OwnerHugo T.
03 · SHIFT MEETING

The meeting prepares itself, on the team screen.

S, Q, P, HR, C, E indicators from several sources, open gaps, overdue actions: one page the whole team can read.

Today

30 min of printing, documents a team of 35 can't read.

With Daystream

The screen is ready. Just run the meeting, nothing to prepare.

Shift meeting

ProductionMon, Oct 13 · morning shift · shift meeting
06:31Start the meeting
SSafety cross · October
12S345678910111213141516171819202122232425262728293031
142 days without lost-time accident
Accident-freeRind careUpcoming
POEE line 2TEEPTRAK
78%target 75%
QDowngraded wheels · 7 days
4todayat most 2
GGaps from previous shift · 3
#132 Scrapped grinding wheelsOpen
#128 Leak slicer 2In progress
#127 Guard station 4Closed
AActions
Replace the seal · Hugo T.Overdue
Recalibrate pH meter · Léa P.Today
Targeted gains

What your team leaders can get back.

5–15min
per round or audit

The team leader stays on the line.

40min
per day per team leader

On the shift meeting, more visual.

10–15min
per day on gaps

Better-prioritized gaps.

3hr
per month, up to

The performance board is already filled in.

Up to 30 min to 1 hr per day per manager.Calculate with your numbers

Targeted orders of magnitude, not a guarantee. They depend on how each plant is organized.

Why Daystream

What makes us different.

Why Daystream is quick to roll out, and stays in use.

One price per plant, all-inclusive

No per-user or per-feature billing. New features are included.

Per plantper userper module

You set it up yourself

Rounds, indicators, meetings: the plant sets its standard, each team adds its own specifics. No development, no extra cost.

Open API

You keep your tools. Daystream shows their data where decisions are made.

TEEPTRAK, no project

In a plant equipped with TEEPTRAK, OEE and losses flow into Daystream with no integration project.

A single point of contact

A dedicated CSM for rollout and your requests. A product that evolves with your feedback.

Getting started

No IT project to set up.

The number one fear is “one more tool nobody will use in three months”. It's ours too. So we start small, we measure, and we decide together.

Getting started in detail

BeforeAccess and devices

Your access, training materials, the hardware list.

Day 1Online training

Admins and the first team leaders take over.

QuicklyOn-site presence

On your lines, with your teams, on your real standards.

6 weeksClose support

A dedicated CSM monitors usage and clears roadblocks.

SummarySix-week review

Against two or three success criteria set together.

Next step

See Daystream in action.

A round, a gap, a shift meeting: we show you the app and answer your questions. A human replies within one business day.