Skip to content

Features

The product sheet, module by module.

Each line is marked Available or Soon, so there are no surprises in a demo.

DashboardsToday's entriesGapsActionsFloor walksMeetingsSettingsAssembly ⌄CBSettings › Floor walks › Templates5S audit of the areaSaveQuestionsFloor clear around the machinesA "No" offers to open a gapYes / NoTools stored on the boardPhoto allowedYes / NoOil temperatureTolerance: between 35 and 55 °CIndicatorGaps found during the auditOptionalNumberAuditor's remarksOptionalTextAdd a questionSettingsTeamAssemblyFrequencyEvery shift, at 06:00 and 14:00Filled in byTeam leader on shiftShown at the meetingYes, in the checklistIndicator tolerance35 °C55 °C
Setting up a floor walk and its questions

Gaps

  • Report from any screen, mobile or computer; only the title is required.Available
  • Configurable SQCDP categories, description, photos and attachments.Available
  • Open, In progress and Closed statuses, with reopening possible.Available
  • Created from an off-target measurement or a floor walk answer.Available
  • Comments and dated history.Available
  • Hand-over to another team, escalation to the next level.Soon

Actions

  • Created in three fields (what, who, by when), linked to a gap or standalone.Available
  • Column view by person.Available
  • To do, Blocked, Done and Canceled statuses, with a mandatory reason to block or cancel.Available
  • Priority, photo, comments, history.Available
  • Ability to assign a person without an account.Available

Indicators and measurements

  • Numeric and yes/no indicators, with unit and frequency of your choice.Available
  • Targets by thresholds; changing a target doesn't alter the history.Available
  • Entry by shift from the computer, the phone or the big screen.Available
  • Color code on target / off target, and grey when the measurement isn't entered.Available
  • Automatic upload of TEEPTRAK data (OEE, stops).Soon

Floor walks

  • Customizable forms: text, yes/no, number, choice.Available
  • Filling in on mobile and floor walk sign-off.Available
  • Gap creation from an answer.Available
  • A question can feed an indicator directly.Available

Rituals and meetings

  • Ritual definition: team, facilitator, frequency, duration.Available
  • Automatic meeting generation and reminders.Available
  • Meeting mode on a big touchscreen.Available
  • Tracking of the meeting completion rate.Available

Dashboards

  • Several dashboards per team, organized by section, SQCDP at the user's choice.Available
  • Built by the facilitator from a widget library: counter, gauge, bars, pie chart, trend, stacked curves, list, breakdown, safety cross, external frame.Available
  • Can be attached to a ritual.Available

Organization and access

  • Teams, facilitators, administrators.Available
  • People without accounts to get started fast.Available
  • Log in with the TEEPTRAK account (SSO).Available
  • Interface in French and English.Available
  • Android and iOS mobile apps, and big shop-floor screen.Available

Support

  • Lean Academy in open access, with the same account.Available
  • Assistant that answers usage questions, photos included, from the documentation and the academy.Available
  • Assistant that reads overdue actions, escalated gaps and off-target indicators and prepares the morning meeting.Soon

Problem solving Soon

  • Structured problem solving with classic Lean methods (5 whys, etc.).Soon
  • Assistant that spots recurrences and prepares the meeting.Soon
  • Import your own problem-solving template, filled in on the big screen like a whiteboard.Soon
  • Attached documents, photos and PDFs; export of the problem-solving documents.Soon

What the category offers and Daystream doesn't sell yet

Structured problem solving (5 whys, PDCA, 8D, A3), escalation with SLAs, knowledge base, global search, ERP / MES / CMMS integrations. They are on the roadmap; this page names them without a date, so no demo surprises you.

See Daystream on your cases, not on a generic demo.

Thirty minutes: a floor walk, a gap, a team meeting on the big screen. Success criteria set together, checkpoint at six weeks.